05-Aug-2021: Overhead crew had moved their truck around to the other side of C2.5113 and were finalising repairing the overhead. A piece of pantograph lay on the ground in the foreground. Once repairs to the overhead were completed, the wires would be re-energised and a tram would be used to tow C2.5113 back onto tracks and then drag it to Southbank Depot.
{2,000 x 1,250 pxl; 1.63MB}